BEKEN
Microplacer has 6 BEKEN parts in stock out of 12 listed, across 3 categories such as Microcontrollers, Embedded MCU, DSP Evaluation Boards and Evaluation and Demonstration Boards and Kits. Prices on this page start at ₹139.3119 per piece (excluding GST, at each part's minimum order quantity), with quantity price breaks. Order online with a GST invoice and delivery across India.
In-stock BEKEN parts
Sorted by stock. All prices in ₹, excluding GST, at each part's minimum order quantity. All parts ship from international direct stock; estimated dispatch 06 Dec 2026 if ordered today.
| Part | Package | Stock | Price (₹, excl. GST, at min. qty) |
|---|---|---|---|
| BK7258QN6855 | QFN-68(8x8) | 2,563 in stock International direct stock | ₹338.4631 at 1+ |
| BK7238QH321 | QFN-32(4x4) | 424 in stock International direct stock | ₹139.3119 at 1+ |
| BK32881QN40EP2 | QFN-40(5x5) | 299 in stock International direct stock | ₹188.8979 at 1+ |
| BK7252NQN482A | QFN-48(6x6) | 144 in stock International direct stock | ₹193.9253 at 1+ |
| BEKEN_RF Test_board | — | 5 in stock International direct stock | ₹2,303.515 at 1+ |
| BK7257_EVB_V1.0 | — | 5 in stock International direct stock | ₹6,389.2036 at 1+ |
How many BEKEN parts are in stock at Microplacer?
6 of the 12 BEKEN parts listed are in stock, across 3 categories.
Which BEKEN products are in stock?
The BEKEN categories with the most parts in stock are Microcontrollers (4), Embedded MCU, DSP Evaluation Boards (1) and Evaluation and Demonstration Boards and Kits (1).
What is the price of BEKEN parts in India?
The 6 BEKEN parts with prices on this page start at ₹139.3119 per piece, and the highest starting price listed is ₹6,389.2036 (excluding GST, price at each part's minimum order quantity). Every part page shows its price breaks; GST 18% is added at checkout.
How much is shipping?
Shipping within India costs ₹100 per order (plus GST) and is free on orders of ₹5,000 or more before GST. Ships from international direct stock; dispatch in 19 days from the order date. Ordered today, the estimated dispatch date is 06 Dec 2026.
